Khyber Pakhtunkhwa (KP) Chief Minister Ali Amin Gandapur reached the public gathering after the designated time expired for the power show on Saturday
According to details, Gandapur had reached the public gathering's venue after the designated time expired.
Meanwhile, it was reported that the public gathering’s central container is being vacated. All of the PTI leaders left the container, including Barrister Gohar Ali Khan, Hammad Azhar, Aliya Hamza
The DG, installed the sound system in the public gathering, was also gearing up to leave the rally.
Lahore Deputy Commissioner Musa Raza warned the Pakistan Tehreek-e-Insaf (PTI), saying that the time for holding the public gathering ends.
Expressing his thoughts, Raza said: “The PTI was given the time to hold the public gathering till 6:00 pm. The organisers of the public gathering should end the gathering.”
Raza stated: “The public gathering’s administration needs to ensure the gathering in the scheduled time.”
– PTI faces logistical challenges, inadequate preps –
Earlier, it was reported that the Pakistan Tehreek-e-Insaf's (PTI) preparations at the venue had been marred by disorganization and logistical challenges.
Despite the nominal arrangements, PTI workers had started arriving at the venue, which was designated at Jallo Park, instead of the initially planned Minar-e-Pakistan.
Party workers have been instructed to reach the venue by 1pm, but as of now, the stage construction at the assembly hall has yet to begin. Chairs and a sound system have been delivered to the auditorium, but the PTI administration has struggled to finalize the stage setup.